Welcome to Xi'An Huayang Oil and Gas Equipment Co.,Ltd!
Product
Drilling Waste Management Syst
Contact us
hotline
+86-29-89820090
MOB:+86-13324595205

MOB:+86-15029057539

FAX:+86-29-89820090

E-mail:lauren.w@xahyyq.com

Company: Xi’an Huayang Oil & Gas Equipment Co., Ltd.

Address:NO. 138, Feng Cheng Nine Road, Economic and Development Zone
location: Home > english > Products > Drilling Waste Management Syst >
Drilling Waste Management
source:西安华扬油气设备有限公司 time:2017-11-10


Processing description as follows:
 
                Rig over mud through overhead pipes sinks into solid control unit (shaker, mud cleaner), after shale shaker and mud cleaner processing, drilling fluids transported through the screw conveyor to drying shaker processing, after trearment fluids through screw conveyor to vertical cutting dryer drying, processed solid waste excluded. After Drying shaker and vertical cutting dryer processing, treated fluids flow into mud tank compartments, by centrifuge supply pump or mono pump delivery to high speed centrifuge to separate the small particles, treated solid excluded, after processing, fluids flow to mixing tank, for recycling, After drying shaker, dryers, and high-speed centrifuge treated water content is waste solid is very low, can be ideal raw material for bricks and road, so as to achieve the mud does not fall to the groun

@2017 Xi’an Huayang Oil & Gas Equipment Co., Ltd. hyoilgas.com All rights reserved.

products:including rigs, rig accessories, mud pumps and accessories, solid control equipment and accessories, wellhead tools, high-pressure manifolds

hotline:+86-29-89820090

Email:lauren.w@xahyyq.com amy.h@xahyyq.com

Address:NO. 138, Feng Cheng Nine Road, Economic and Development Zone

Shan ICP for 17011966